Smiths Road Bridge over the Gudgenby River fell victim to flooding in December 2010, collapsing one pier and 2 spans of the structure and isolating the local community. Complex was engaged to construct a replacement 32m single span bridge in a new alignment over the river. Due to load limits imposed on surrounding bridges, heavy vehicle access was extremely restricted, requiring the post tensioned girders to be cast on site and placed into position using a complex dual crane lift operation. The lifting methodology was modelled in 3D to analyse the procedure and coordinate on site processes to the construction team. The scope of works included removal of sections of the collapsed bridge from the river bed and dismantling of a Bailey Bridge, setup as temporary access for local traffic. Approach road pavements and geometry were upgraded during the project and significant scour protection added to protect river banks. Located upstream of the Murrumbidgee River drinking water catchment, protection of the waterway was critical during construction.
Complex implemented a number of innovative controls and monitoring systems to ensure protection of the waterway, including filling of sandbag cofferdams with on-site sand won from excavations at the new abutments.
Let us know how we can help, get in touch via the form below.
We’re constantly on the lookout for new talent. If you like what you see and want to join our team, fill out the form below and we’ll get back to you as soon as we can.